I have a couple of questions about an existing system that I have encountered:
System consists of qty (3) 480VAC, 1125 KVA, continuous rated generators. Each generator feeds a piece of paralleling switchgear at the 480VAC level, which then feeds individual 480V:12.47kV wye-wye step-up...