  1. javan210

    visual inspection during hydrotest

    Dear Rneil, The code is Api1104, but we have to test the buried pipe connected to aboveground totaly as one package.
  2. javan210

    visual inspection during hydrotest

    Dear Friends, We are going to test a piping system which includes some underground and aboveground piping sections. The system shall be tested as one package. Can we eliminate the weld joints visual inspection for underground portion? (because we have to perform the wrapping before hydrotest)...
  3. javan210

    advice to pulling out a submersible pump

    Dear racookpe1978, Thank you this is a good idea,
  4. javan210

    advice to pulling out a submersible pump

    Dear whammett, Thank you for your reply. Ca you send me any image of such device. Thank you
  5. javan210

    advice to pulling out a submersible pump

    Dear eacookpe1978, Thank you for your reply. the wall iner pipe is pvc, the pump and it's pipes are carbon steel and magnetic, but i am not sure to send the magnetic device under the water, because most of them are working by electricity.
  6. javan210

    advice to pulling out a submersible pump

    Dear friends, I dont know if this forum is a right place to ask this question or not? We have a 100m deep water well. during the pump installation one of the pipes has broken from the flange weld and the pump (together with 3 pipe) was fallen in the well. now i need an advice how to pull out the...
  7. javan210

    sour water accumulation system design

    Dear friends, I need some information,design basis, PID, PFD and design procedure for sour water accumulation system. currently, we have a sour water stripper, we want to put an accumulator+pump+air cooled exchanger to send the sour gases to SRP and Flare proportionaly. Thank you.
  8. javan210

    pv fabrication shop optimum dimensions and layout

    Dear Friends, We are going to establish a new fabrication shop for CS and SS pressure vessels, and Processing Columns. Could you please tell me how can I find some technical hints about optimum dimensions (like the heigth behind the crane hook, length and weidth,... and layout of the...
  9. javan210

    how to support valve and pipe on the top of U/G headers?

    Dear Friends, We have two 48" u/g header and some valves and piping above them. how can we support valves and piping? we can not implement any foundation for valve or pipe support on the top of U/G pipes. Thank you
  10. javan210

    belt driven fan alignment

    Dear TMOOSE, The motors are mounted in fix bases. Thank You.
  11. javan210

    belt driven fan alignment

    Dear freiends, I am recently involved in a project to install some air cooled exchanger (Gas Cooler) Fans. The fans are driven by timing belts throught 2 timing pulley, I am seeking for a procedure or manual for installation and alignment of the system. Motor and Fan shafts are vertical and...
  12. javan210

    "dust collection system for paint production line"

    We are producing paints like: Alkyd paints, Zink silicate, Zink phosphate and epoxy paints by mixing manualy.
  13. javan210

    "dust collection system for paint production line"

    Dear Friends, Can anybody explain the dust collection system suitable for a "paint production line". Best regards