Thank you for the feedback. Very relevant tips. Other than positioning the autoclave in a pit, does anyone have tips on leveling. I need to level mainly the bed/rails which will be positioned on sloping floor with half a meter of drop over 50 meters?
I am modifying a facility to house a large autoclave in an urban area. Next to power requirements and legislation, what are the crucial things I should consider?