Thanks for the quick responses. Geogrid was suggested at the beginning of the project. And unfortunately the Consultant dropped the ball and allowed the Base to be placed. I neglected to mention that the majority of the Finish Base is good. The pumping is isolated to an area 24'x 60' in a...
I'm currently on a project that has a subgrade issue that was not addressed and covered with Base. Six inches of Recycled Class II Base was moisture conditioned and compacted. The density results over the pumping areas were allegedly 95%+. However in my experience, it's sometimes possible to...