Good post, 737eng.
An operator must have an FCBS / FCAS to screen future repairs and determine which will require DTE. If, as an operator, all of your non-SRM repairs will go through Boeing, you can make a case that you don't need the list of fatigue critical structure as Boeing will screen it...