Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations waross on being selected by the Tek-Tips community for having the most helpful posts in the forums last week. Way to Go!

Search results for query: *

  1. twheng

    Peer Review

    Thanks we already have that doc. (I think i found it from one of your earlier replies to someone else) Is there any information on the "lifespan" of this stuff?
  2. twheng

    Peer Review

    Thank you for the reply. The County is going to have Caltrans take over the maintaince so they(Caltrans) wants it to their specs. We have never done AASHTO but the bridge is simple so we decided to give it a go. We appreciate this heads up and we will look into it. If there is other heads up...
  3. twheng

    Peer Review

    We are designing a small pedestrian bridge in Calif. that needs AASHTO design. Can someone help with guidance and/or peer review.?
  4. twheng

    Blast design for roofs

    Our office is in the process of designing a small tiltup with very low blast. Our question is with the roof. We are planning on using concrete over metal pan because the metal deck manufacturer does not have specs for blast. Has anyone crossed this path? Is there any design proceedures or...
  5. twheng

    Who specifies the top of caissons?

    hokie66 This is exactly our position, but we were looking for some backup (paper) to explain to him that he needs to do this. We have provided all the details necessary for the contractor to do the math. I think he as never installed caissons before. Thom
  6. twheng

    Who specifies the top of caissons?

    Thanks a2mfk You got the idea but the contractor wants the elevations and we are reluctant. We can easily provide the top of caissons with respect to the outside grade. This is basically a few additions or subtractions from our details. Most of the contractors we work with have no problem...
  7. twheng

    Who specifies the top of caissons?

    Thanks, For the help and if the project was a simple slab on grade or flat it is a very simple addition or subtraction calculations based on the architects elevations. If the site is on a steep slope and we need to rely on the outside finish grade (Which has never been exact as long as i have...
  8. twheng

    Who specifies the top of caissons?

    With a structure entirely on drilled piers on a sloping site. Who is responsible for determining the top of the pier? The structural or the contractor? Thanks
Back
Top