We are supporting a project demanding strict quality. The client is proposing to use Non-shrink grout under base-plates and other structural components. We can not find an ASTM Standard that specifically addresses "Field" testing of the grout.
We have referenced the following ASTMs:
C 109
C...
We are supporting a project demanding strict quality. The client is proposing to use Non-shrink grout under base-plates and other structural components. We can not find an ASTM Standard that specifically addresses "Field" testing of the grout.
We have referenced the following ASTMs:
C 109
C...
We are testing post-installed anchors in concrete, utilizing a hollow-cylinder jack, pump and pressure gauge type assembly; similar to the configuration referenced in ASTM C 900 and/or ASTM D 4435.
We have calibrated the pressure gauge and standardized the system in accordance with Annex A1...
A detail calls out for rebar to be welded; yet, welding rebar under harsh scrutiny for this project may not be a viable option?
The location of the welded connection forms a "cross" and was wondering if there are any mechanical connectors made for that type of application?
We are trying to determine the modulus of a soil subgrade underneath a concrete slab in an existing structure.
We are cutting a 3' x 3' square hole in the slab to access subgrade.
What would be the most cost-effective way to determine this?
Doesn't the absorbed water, in aggregate(s), effect the water/cement ratio?
The below definition would indicate not, but couldn't the absorbed water play a part in the total water/cement ratio?
As defined in ACI 2008:
Water-cement ratio - the ratio of the mass of water, exclusive only of...
I'm tracking down more information on the dimensions and volume of the pour. I was looking for generalities regarding the pros of 3/8" aggregate in a batched mix as opposed to sack grout.
I will post more information as it becomes available.
We have a requirement that the max. size aggregate in a grout mix be 3/8" and be batched from a ready-mix plant.
What may be some benefits of have a 3/8" aggregate in a mix?
I don't have the infomation as to when the control joints were cut.
I appreciate everybody's input. If any recommendations on how to resolve/alleviate this problem could be suggested - also greatly appreciated.
Thanks bimr - excellent information. Please see attached picture. This is one of the most severe instances of the cracking along the control joint. http://files.engineering.com/getfile.aspx?folder=c1fd1eef-5aba-48fa-a0bf-fdcbed3dabd4&file=Crack_VII.JPG
There was a new building constructed (less than 2 months old) and the reinforced concrete slab has considerable surface cracking near the control joints in some instances and nearly in the middle of others.