Thanks for the reply 'oldestguy'
It is true that all possible failure scenarios should be considered. I imagine that the worst case scenario would be when the two pipelines mobilize the uplift resistance at the same time. In such a case, we might end up with a limited shear surface. The uplift...
Hello everyone
I am working in an offshore pipeline project where we are planning to install two 10 inch pipelines wall-to-wall directly on the seabed. The pipelines will then be covered by rock dumping. Designing the rock cover height for uplift resistance for a single pipeline is rather...