Thanks for the replies.
The procedure I have used with Civil 3D is to prepare two separate volume calculations: One from my existing ground to proposed ground. For the second calculation, I dropped the entire existing surface 18" and calculated the volume from that dropped surface to the...
Hello all,
I am currently working on calculating the total earthwork (using Civil 3D) for a proposed site and I have some questions with respect to shrinkage. Specifically, the site geotechnical report states that the upper 18 inches of existing soils has a 25% shrinkage, while soils below 18...