Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations GregLocock on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Search results for query: *

  1. ewbeng

    Methods to determine pre- and post-runoff volumes

    Thanks all for the great input! I really appreciate it ~
  2. ewbeng

    Methods to determine pre- and post-runoff volumes

    I am trying to determine the pre- and post-development runoff volume for the 25-year, 6-hour storm (per City requirements). Note, this is a very small project - they are proposing to add 2,067 sf of concrete and 2,624 sf decomposed granite to a 13,685 sf area (existing lawn). The City...
  3. ewbeng

    Graphical Peak Discharge Method for 25-year, 6-hour storm

    I'm having a hard time finding guidance on using the full SCS hydrograph generation procedure. (Again, I'm having to brush up ...) I've gone back through as much information as I can find ... and it's all a vague overview, or at least doesn't seem to give me enough information to actually put...
  4. ewbeng

    Graphical Peak Discharge Method for 25-year, 6-hour storm

    psmart, Thanks for the quick reply and information. As I mentioned, I had to brush up to get to where I'm currently at and figured I must be going down the wrong path (Graphical Peak Discharge Method) ... so the full SCS hydrograph generation procedure? ... is there a manual procedure for that...
  5. ewbeng

    Graphical Peak Discharge Method for 25-year, 6-hour storm

    I am trying to determine the pre- and post-development runoff volume for the 25-year, 6-hour storm (per City requirements). I've brushed up on the various methods and would like to use the Graphical Peak Discharge Method. Where I get confused (and maybe I've selected the wrong method) is the...

Part and Inventory Search