Ron, it's a delicate situation. I have asked many times to change but they refuse too.
Anyways, the matter has been resolved, though in a less technical manner.
Cheers
Thanks Ron.
Yes, bridging is expected to occur. Especially since the construction method is to place 1st lift at 200mm and the 2nd at 150mm. However, our verification manager still request 1st lift testing. Consistent construction methodology does not provide enough validation that the first...
Dear All,
Our project has been using nukes to obtain our density readings. Our standard probe depth is 150mm.
A layer of fill, total thickness is 350mm height. We have been testing 150mm depth from top of this layer. My question is, is it possible to determine or give an indication of the...