  1. mdsullivan3

    suspended concrete cut out repair

    the pile will have a steel headstock on top and then a 50mm grout pad to connect with the bottom of the deck. my problem is how to refill the concrete deck for structural integrity purposes. my team was initially tossing up those two options that i earlier said because we must re-fill the...
  2. mdsullivan3

    suspended concrete cut out repair

    i have a problem where i have had to cut out a square 750x750 from a 600mm suspended deck for piling purposes at a sea berth. i was wondering what was the best solution as i have just started working in this area and am a bit inexperienced. have a 100mm pre cast panel placed at the bottom of the...
  3. mdsullivan3

    sea berth repair

    i have a construction method problem in regards to a sea berth, the concrete deck has settled 50mm and our client wants to put in more piles(deeper than existing) and a steel beam underneath the deck to help stabilise the deck from fender forces and vertical loads from cranes,etc. we have cut...