Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations MintJulep on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Search results for query: *

  1. bepalo

    Blowdown pipe erosion

    Have a surface blowndown line 1" in dia. It tees into a 2" forged steel tee. Boiler pressure is about 100 psi. The eroded spot is directly above the tee and the reducer from 1" to 2" is about 6" prior to the tee. Downstream it leads to a drain. The failure occurred after approximately 18 months...
  2. bepalo

    Head required for backwashing a filter

    This is a proposed addition to an existing surface drinking water plant that occasionally experiences nitrate issues. Based on the relatively small (~1.5% of total sys. flow) volume required, I was considering diverting some water from the plant distribution pumps but that water would need...
  3. bepalo

    Head required for backwashing a filter

    I am doing a preliminary design for an ion exchange system. I have data for the headloss (pressure drop) across the media in the operating direction but how much head would be required to backwash and expand the media to 50%? I would imagine that the ion exchange media would behave similar to a...

Part and Inventory Search