Dhengr and MJCronin,
Agreed with you for not providing enough information and does not make sense to expect what I need without providing the real scenario.
We are fabricating the whole tower, perform hydro test and cut the tower into halves for shipping. The bottom section (77’ tall and weighs...
Hello,
I'm designing a tray tower 13 ft Dia and 0.875" thk. Due to some space constraint in the field, this tower needs to be cut into two halves. I need some insight for evaluating stress in the design of tailing lug for top section and trunnion for bottom section as these will be the open part...