Thanks for the tips so far guys. I was arguing with our Project Eng about this yesterday (I'm trying to tell him we can't just say it's ok unless we find the specific reference in code).
I know 31.3 is for new construction, but tracking down where I can get an exact answer has been a lot of...
Hey Everyone,
I'm trying to find in ASME B31.3 Process piping the allowances for damage to piping (specifically sidewall).
IIRC, scratches and nicks were permissible as long as they were less than 10% of wall thickness, but I can't remember with 100% certainty.
Anyone know where in code it...
Hey Everyone,
I'm trying to find information on the allowance for damage to 31.3 piping due to shipping/transportation.
IIRC, ASME 31.3 allowed scrapes/cuts to sidewall of piping as long as it was less than 10% of wall thickness. I can't find it in code though. Anyone know which section of...