  1. henryt1

    Sizing Smoke Exhaust Fan.

    First time doing the smoke exhaust. Should I base on the air change? If that is the case, how many air change should I use? Someone, please give me your advice. Thanks in advance
  2. henryt1

    Requirement For Clean Room, Class 10,000

    Thanks cdxx139
  3. henryt1

    Requirement For Clean Room, Class 10,000

    This is the first time I design for clean room, class 10,000. I could not find any design guideline, hopefully, some Clean room expert can help me out: 1. How many air change should I apply for this clean room class 10,000 ? 2. Can I use the return air (or partial return air) or have to be 100%...
  4. henryt1

    General requirement for chemical storage

    Hi all, I have a 12,000 sq.ft chemical storage project in Congo. It is fully conditioned and Baker Hughes owns it. This is kind of new to me. Anyone with experiences in chemical storage for oil company please guide me how to proceed with this project. Thank you very much in advance
  5. henryt1

    Find out the max. length of the decoupled bypass in primary/secondary

    Hi anyone, We have 12" common pipes for the primary/secondary chilled water system. Due to the space limitation of the pump room, the contractor reroute the 12" decoupled bypass pipe to 7 ft. On center. Does anyone know how to figure out the maximum length or by rule of thumb for the decoupled...
  6. henryt1

    Code Violation

    The building was built in 1967 with all the supply ducts were insulated internally. This practice is not accepted today. Anyone knows where on code books that shows this is unacceptable, please points out. Thanks for your great help