  1. EngAzat

    CHW Demand Reduction Sequence

    Hi, (1000 ppm Return + 400 ppm ambient, will not be 1400 ppm supply). It can be calculated as follows: (CFM return/ppm return)+(CFM OA/ppm ambient)=(CFM supply/ppm supply) So, ppm supply=CFM supply/[(CFM return/ppm return)+(CFM OA/ppm ambient)] Sure it will be less than 1000ppm.
  2. EngAzat

    Humidity Controller not working

    Is your system was working properly before? Is there any new equipment installed recently? Are the inlet filters cleaned regularly? Is the humidistat in a clean zone?
  3. EngAzat

    CHW Demand Reduction Sequence

    This is the second attachment.http://files.engineering.com/getfile.aspx?folder=cd20390e-5cb3-4e1d-ae93-5c75321c86bb&file=ERV_catalog.rar
  4. EngAzat

    CHW Demand Reduction Sequence

    Hi cdxx139, Increasing the zone set-points is part of the solution plus reducing the fresh air quantity a little bit will also do. I would like to draw your attention that you can get more of your AC system by using the recovery technique(please,see the attachment). Good luck...
  5. EngAzat

    HAP 4.41 Heat Loss/ Heat Gain Calculations.

    Hi raptors076 I think the attached pdf file will be helpful Good Luck http://files.engineering.com/getfile.aspx?folder=b38b5269-3e7a-436a-84ce-a53bad9c89f9&file=425-8-Coil_Load_2006.pdf
  6. EngAzat

    Pump Pulsation Damper Required

    Hi ChemEngSquirrel, In my opinion installing a vessel (accumulator)in the discharge line will act as a damper. Good luck
  7. EngAzat

    Selection of a linear actuator

    Hi NathanielM, I think for your application power screw with reversible direction motor will be sufficient and reasonable price.
  8. EngAzat

    Rocker pieces

    Thank you.
  9. EngAzat

    Water System Design (Well) for Commercial Bathroom

    I agree with Mr. RH27.You have to collect the required data and accordingly you can decide the complexity of your project and the estimated required budget.
  10. EngAzat

    Rocker pieces

    In case of HDPE pipe line to be connected to a valve chamber (DI connection in and out of it),is it advisable to use rocker pieces upstream & downstream the valve chamber. Is there a standard supporting this issue?