  1. CivilEngMatt

    Time of Concentration

    I'm working on a project that has an existing pond on the property. I delineated the drainage basin contributing stormwater runoff to the existing pond. My question is: How should I determine the flow path for time of concentration calculations. I'm using the LAG method. I have two options...
  2. CivilEngMatt

    CLOMR procedure

    1. To generate a floodway model you will need to do part 2 below first. After you have all the models built you can begin with using method 4 using 1' as a target increase. Then you can use method 1 to refine the floodway delineation. 2. The first thing you need to do is obtain H&H data...
  3. CivilEngMatt

    Detention Pond Inside Floodplain Zone AE

    I have had several sites with this same scenerio here recently. My approach is as follows: Step 1: Determine the time to peak for your site at the confluence with the stream. For small basins using the SCS method this is typically around 12 hours. Step 2: Determine the time to peak of the...