"there would be a small moment in the bolt, but reasonly negligible IMHO."
The beam is more than a meter long and the force reaches about
1 Kgf.
Dont you think the moment needs to be addressed ?
When you say "Rt+Rm = 1/RF"
what does Rt,Rm,RF mean ?
Hello,
What is the most accurate way to calculate the failing point of a preloaded bolt connecting between a fixed metal roof and a cantilevered beam. See image attached.
Thank you in advance.