If you have different variable tail water elevations corresponding to different storm events, can you use the same link node in HydroCAD? It seems like you should, as the elevation tab lets you select different events, however when as soon as I define a second event, it overwrites the first...
We actually do have topo. The sewer line is within a campus (mostly under green space), so traffic issues are not involved. All the services to the buildigns are from manholes, and according to the information that I have, don't need to be repaired.
I am looking to put together a cost estimate for plans and specs for a sanitary sewer repair through lining of the pipe. The pipe size is 8-inches, but I am not sure what the material is. I am thinking that all that would be required is a plan sheet showing where the repairs are located, and...