metengr - thanks for your replu.
How do I know that the pipe was not "cold worked"? It is purchased from an approved mill from the client I am working for, however, it was purchased from the secondary market. Although we have the MTR's and all checks out fine, the client is still asking about...
The above referenced code, Paragraph (b) states that "when pipe that has been cold worked for meeting the specified minimum yield strength is subsequently heated to a temperature higher than 900 degrees F (482 degrees C) for any period of time or over 600 degrees F (316 degrees C) for more than...
I am trying to source some vertical can pumps for a low pressure NGL handling operation and am getting lead times of 26-30 weeks. The specs are as follows:
Liquids = Hydrocarbons
Flow = 300 US GPM
Pump Temp = 58 degrees F - 84 degrees F
Specific Gravity = 0.5485
Vapor Press = 763.1
Viscosity =...