Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations KootK on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Search results for query: *

  • Users: hhes
  • Order by date
  1. hhes

    Monitoring Well Construction

    Consider, too, how you want to construct the well so that the sampling personnel do not have an excessively long purge time. If these are shallow probes, you can get away with just a small diameter (1") probe. If these are deeper, you may want to consider the installation of some smaller...
  2. hhes

    SPCC - Rail Rack Specific Containment

    The SPCC is being revised. The previous plan didn't really take these issues into consideration. This location moves a lot of different chemicals. No gasoline, but it does handle ethanol.
  3. hhes

    Zero Pressure Drop vs. Time in Monitoring Well. What does it tell me?

    It sounds like the "pilot test" was somewhat limited. Did you do any step tests? Do your pilot test data allow to approximate the pneumatic characteristics of your vadose zone? The way your post is written, it sounds like you did one constant-rate test during the pilot. Is that right...
  4. hhes

    SPCC - Rail Rack Specific Containment

    I'm searching for a definitive answer to an issue surrounding rail car loading racks and secondary containment. Short story is this: a facility has a permanent rail car loading rack system. Below the tracks is gravel that is sloped toward a drainage ditch. The ditch leads to an oil water...

Part and Inventory Search