I thank Ron and BigH,
My question is whether you do proof-rolling on a cut that is going to be filled with another base material. It was decided that a certain depth was to be removed and then filled and compacted to a given proctor value. I need to check the proctor value on the fill using the...
I am going to observe as a building construction inspector the cut that is going to be done in the near future for a parking lot. I was instructed to perform a proof rolling on the cut. I thought you were supposed to do proof rolling to see if there was either a rut or pumping before you do the...