hydroponder
Civil/Environmental
- Nov 21, 2008
- 74
I am modeling an industrial lot that will have three infiltration basins to manage stormwater. Per the watershed district, I have to analyze rates for the 100-year 5.9" rainfall and the 10-day snow melt (7.2") event. It seems to me that the peak runoffs should be a little closer than the rates I am seeing. Just wondering if I am missing something. The 100-year rate to the east is 20.90 cfs and the 10-day snow melt rate to the east is 1.97 cfs. Seems odd... Both HydroCAD models are attached.