sagarini
Electrical
- Jan 13, 2009
- 6
we are installing a 1500 kva dry type transformer in a chemical plant on a concrete pad. we are feeding the transformer from underground. i have been asked if the conduits that feed the transformer have to come up through the concrete itself or if they can come up by the side of the concrete pad. any help would be greatly appreciated. thanks.