Paulpower
Electrical
- Jul 19, 2008
- 10
Can anyone help me with the following?
For a metal-clad unit substation, incoming line are 15KV 2/0 cable from O/H line, feeder cables are 4 run of 4c300MCM 1KV cables, both are bottom entry.
How to specify the cable termination? oudoor on the O/H pole and indoor in the switchgear.
Cable boot with cold shrink kit are required? How to fix cable gland and sleeve to the switchgear gaskete?
Do I need cable joints?
Thanks!