rholder98
Structural
- Oct 5, 2005
- 158
I am analyzing a concrete building to determine the capacity of the 8th floor. Surprisingly, I have drawings. The joists and beams are scheduled, so I have the reinforcing. The schedules list, for example, '1 7/8" dia. mark 703'. The bar bending diagram tells me what mark 703 looks like. However, each joist has one or two bars marked "S+". S+ is not in the diagram, so I think it is just additional straight bars. I just can't tell if it goes in the top or the bottom. Can anyone shed some light?