BronYrAur
Mechanical
- Nov 2, 2005
- 798
B&G recommends a maximum of 25' DP across its circuit setters. In a campus distribution system, I have a couple of buildings near the chiller plant that are seeing more than 25' across their circuit setters. The most remote (longest TEL) branch has its circuit setter wide open. The buildings in question have their circuit setters cranked way down due to their proximity to the plant.
It has been suggested to put 2 circuit setters in series so that the pressure drop across each one is less than 25'. Anyone ever done this? I don't think I have even seen it before?
It has been suggested to put 2 circuit setters in series so that the pressure drop across each one is less than 25'. Anyone ever done this? I don't think I have even seen it before?