I propose to install 3 x 4 MW output boilers i.e. (3 x 13,648,000 Btu/Hour) into a large MTHW space heating system operating on a constant temperature and variable flow principle (I.e. 3 way diverting valves at air handling units).
Another party has proposed using 12 x 1 MW output boilers i.e. (12 x 3,412,00 Btu/Hour).
The second proposal seems to me one that would prove problematic in terms of control and could result in poor operating efficiencies.
I would appreciate some for/against ponts from any experienced designers.