ZHA

Materials
Aug 10, 2017
60
Is post heating mandatory to be done on 4130 material. We are required to meet hardness of 250 Hv10 and every weld would be subjected to PWHT. Thickness range - 0344" - 1.88". Weld consumable - ER100S-G, E101T1-GH4.
If yes then at what temperature and how much time.
 
Replies continue below

Recommended for you

To meet the hardness requirement PWHT would be necessary on material 1/2" or greater in thickness. You would find this out when you qualify a WPS with hardness testing.

The PWHT temperature would be 50 deg F below the original tempering temperature of the 4130 if it was supplied as Q&T or N & T.
 
Time is 1 hour per inch of weld deposit thickness.
 
I meant preheat maintenance after completion of welding before PWHT
 
There is no preheat maintenance after welding is completed. You cool and apply PWHT if required.
 
Thanks mentengr for the help.
 