We are adding a three phase service to a ajoing shed by our fab shop. I have and would like to use a C/H 480/277 4Wr-3Ph switch panel with adjustable main. The thing is I have 208/120 3 ph as the primary shop power. Given the cost of these things, I would like to use the 480 panel I have on the 208/120. Is there any forseeable problems with this idea, manily I'm concerned about issues with the breakers "seeing" the load correctly. Thanks in advance, your opinions are greatly appreciated.