what is the proper procedure?
we need a part which is constructed with a 90 degree elbow tube weld to a flange. so, we will select O (annealed) condition for both components (mainly the tube has to be O to be bent). after welding, we want to get it to T6 condition. should the part go thru solution stage first or just 350F precipitation?
thanks.
we need a part which is constructed with a 90 degree elbow tube weld to a flange. so, we will select O (annealed) condition for both components (mainly the tube has to be O to be bent). after welding, we want to get it to T6 condition. should the part go thru solution stage first or just 350F precipitation?