Geotechnical
- Dec 10, 2007
- 4
A 500 foot long by 50 foot wide area has approx 7 feet deep soft saturated fat clay. It is set to receive 13 ft of fill and hold up some small structures and possibly a parking lot. Our preliminary recommendation is to over excavate and replace the 7 feet of soft material. Any other cost effective ideas?
Thanks
kansascity
Thanks
kansascity