Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations IDS on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

ABAQUS set a limit time for the esecution of a job

Status
Not open for further replies.

mbpro15p

Structural
Apr 7, 2013
5
hello,



as title says, does anyone knows how to fix a limit to the time that an abaqus job takes to be calculated.



this is because i am running several jobs sequentially, and i want to set that for instance if some job takes too much time, just stop it and go to the next one.



thank you a lot.
 
Replies continue below

Recommended for you

You can make a bash script of your jobs:

abaqus analysis job=blabla
sleep 1000
abaqus terminate blabla

and loop over all the jobs you want to run.
 
Status
Not open for further replies.

Part and Inventory Search

Sponsor