amt2013
Geotechnical
- Aug 28, 2013
- 6
Hi,
I am running an unsaturated slope stability simulation with Plaxis. I have completed the consolidation calculation and I continued the calculation for safety. At the last phase of the safety calculation, an 'accuracy condition not reached in last step' message appeared. Does anyone know why it happened and how do I overcome this to complete the calculation? Thank you very much.
I am running an unsaturated slope stability simulation with Plaxis. I have completed the consolidation calculation and I continued the calculation for safety. At the last phase of the safety calculation, an 'accuracy condition not reached in last step' message appeared. Does anyone know why it happened and how do I overcome this to complete the calculation? Thank you very much.