I placed a note on my structural drawings saying:
Work on ----- shall conform to ALL requirements of ACI 301......
I also placed a note about the contractor submitting shop drawings to the SER for review and acceptance before fabrication proceeds.
It is my understanding from reading the ACI 301 spec that such a note requires the Contractor to comply with ALL requirements of ACI 301 unless specifically told otherwise. I have a contractor who has not submitted one item for review or acceptance and he is going to place the foundation tommorrow! Am I missing something or is he just clueless concerning his role as a contractor? He hasn't even submitted the placing drawings or mix design and he is going to place the concrete tomorrow! Has anyone ever had this problem, if so...do you have any suggestions?
Thanks in advance
Work on ----- shall conform to ALL requirements of ACI 301......
I also placed a note about the contractor submitting shop drawings to the SER for review and acceptance before fabrication proceeds.
It is my understanding from reading the ACI 301 spec that such a note requires the Contractor to comply with ALL requirements of ACI 301 unless specifically told otherwise. I have a contractor who has not submitted one item for review or acceptance and he is going to place the foundation tommorrow! Am I missing something or is he just clueless concerning his role as a contractor? He hasn't even submitted the placing drawings or mix design and he is going to place the concrete tomorrow! Has anyone ever had this problem, if so...do you have any suggestions?
Thanks in advance