A 400 kV SS contractor wants to use spared ACSR for equipment and bay jumpers, I have doubts that the ACSR will not be maneuverable as AAC for this purpose, is there any figure to make this feeling mathematically sensible? e.g. minimum bending radius, stiffness, lateral stiffness, birdcaging limit,...etc.