L_K
Structural
- Sep 22, 2016
- 267
In an analysis with multiple load steps (>10), is there a way to add
a new load step in between the old load steps?
Also is there a way to delete a specified load step from analysis?
Thanks in advance.
a new load step in between the old load steps?
Also is there a way to delete a specified load step from analysis?
Thanks in advance.