Air core Inductance manufacturer

Status
Not open for further replies.

Icefire55

Electrical
Aug 13, 2019
3
Currently got a customer in need of a replacement for an Air Core Inductance for yesterday.
Most of my regular are 12-18 weeks delivery..
Specs are 6kV rated 30A 20ohms 53uH 15kV class.

Customer's SF6 breaker opened but one phase got stuck closed, resulting in a single phase current to ground of about 350A continuous..

I hope that kind of post is permited, Currently stuck...
 
Replies continue below

Recommended for you

Trench is the main supplier we've dealt with.
 
Canada, can be USA.

Trench is 18 weeks delay...
 
Doesn't sound unreasonable. I won't waste bandwidth throwing out more names because I don't know who you've already contacted.
 
Main suppliers of air-core reactors to North American market:
Trench
GE/Alstom Grid
Coil Innovation
TEEE
PEC - Phoenix Electric Corporation
 
Did you check if repair the Air Core Reactor is an option?

 
We had already contacted TEEE / Trench / REX, I was hoping you would reply Scottf, thanks

Repair is not an option, those are epoxy dipped, which would take way more time in cost..

Still waiting on TEEE for their delay, since they are from China, it might be a long boat run.
 