Tofflemire
Marine/Ocean
- Oct 3, 2002
- 312
Hi All,
I know how to align views, but is there a way to have individual view linked to other views, so that when you move one view the others move. The real problem is that our company does not have pro cable; I have an assembly view with the connectors way out in left field, so I added a view of the connector under the assembly (blanked left field connectors) and sketched in the cable. Now my drawing needs to be adjusted to make room, which is problem, I have 3 views set up like this. I could make these views snap shots and relate the 2d connector to the view, but this is just another band-aid fix.
TIA
Tofflemire
I know how to align views, but is there a way to have individual view linked to other views, so that when you move one view the others move. The real problem is that our company does not have pro cable; I have an assembly view with the connectors way out in left field, so I added a view of the connector under the assembly (blanked left field connectors) and sketched in the cable. Now my drawing needs to be adjusted to make room, which is problem, I have 3 views set up like this. I could make these views snap shots and relate the 2d connector to the view, but this is just another band-aid fix.
TIA
Tofflemire