Hello everyone!
I have been reading the code, trying to figure out this problem.
We are using a precast trench (i.e. Trenwa) for 2 circuits of 4 sets of 3/c 350kcmil, copper. We are trying to figure out which table in the code would be applicable for the ampacity. It is not exactly in cable tray, it is not exactly in duct and it is not exactly direct buried. I have seen many substations utilize this system, but how is the ampacity determined?
Any help would be greatly appreciated!!
Thank you!
I have been reading the code, trying to figure out this problem.
We are using a precast trench (i.e. Trenwa) for 2 circuits of 4 sets of 3/c 350kcmil, copper. We are trying to figure out which table in the code would be applicable for the ampacity. It is not exactly in cable tray, it is not exactly in duct and it is not exactly direct buried. I have seen many substations utilize this system, but how is the ampacity determined?
Any help would be greatly appreciated!!
Thank you!