v2
Structural
- Jun 2, 2002
- 95
the contractor discovered an abandoned empty pit in the ground as he was excavating for the column foundation.
the pit is about 6 to 8 foot deep and happen to be under the spread footing of the column. the contractor proposed filing up the pit with concrete.
Is this acceptable?
thank you. V2
the pit is about 6 to 8 foot deep and happen to be under the spread footing of the column. the contractor proposed filing up the pit with concrete.
Is this acceptable?
thank you. V2