mceschin
Petroleum
- Feb 8, 2017
- 3
I am working on a tank calculation for FRP vessels and using API 650 as a guide to develop the sloshing calculations. The graph provided in Figure E-1 (Ci coefficient) seems to limit out at 1.5 (H/D) ratio. Has anyone out there had experience in what to do when the magical 1.5 H/D ratio is exceeded?
thanks!
thanks!