I have new tanks under construction acc. to API 650.
I wondering what should be the scope of NDT for FW on Shell to Bottom plates.
API in points:
[ul]
[li]7.2.4 Shell-to-Bottom Welds mention mandatory tests on the initial pass.[/li]
[li]7.3.3 Examination and Testing of the Tank Bottom telling about the test upon completion of the tank bottom. Is mention about all welds.[/li]
[/ul]
My question is if 7.3.3 is applicable for shell-to-bottom welds also or not?
Thank you in advance for support.
I have new tanks under construction acc. to API 650.
I wondering what should be the scope of NDT for FW on Shell to Bottom plates.
API in points:
[ul]
[li]7.2.4 Shell-to-Bottom Welds mention mandatory tests on the initial pass.[/li]
[li]7.3.3 Examination and Testing of the Tank Bottom telling about the test upon completion of the tank bottom. Is mention about all welds.[/li]
[/ul]
My question is if 7.3.3 is applicable for shell-to-bottom welds also or not?
Thank you in advance for support.