why does not api 650 define heating and cooling rates for PWHT,should i use ASME VIII DIV.1 UCS 56 to define it
also it requires PWHT for clean out door and nozzle openings what about shell?
and it states that nozzle of a a certain dia. in a certain shell thickness is to be prefabricated and the prefabricated assembly is to HAVE PWHT what does that mean?
also it requires PWHT for clean out door and nozzle openings what about shell?
and it states that nozzle of a a certain dia. in a certain shell thickness is to be prefabricated and the prefabricated assembly is to HAVE PWHT what does that mean?