Alexthegreat
Structural
- Feb 16, 2024
- 2
Hi All,
A contentious one I have seen multiple time on projects is the application of API 686, 3.6.2 "A minimum of 25mm of concrete must be removed in this chipping process". Previously we have engaged concrete consultants who wrote memorandums explaining that the intention should be to get rid of laitance to the requirement of the grout supplier surface roughness in order to achieve the grouts properties as stated.
However i see in ACI 351.1 Cl 6.2.3 that this 25mm for epoxy grout and 6mm for cementitious grout is not only for laitance but to manage the thermal expansion of the epoxy grout.
Does anyone have evidence this is required? typically here in Australia we scabble and grout without thinking too hard.
A contentious one I have seen multiple time on projects is the application of API 686, 3.6.2 "A minimum of 25mm of concrete must be removed in this chipping process". Previously we have engaged concrete consultants who wrote memorandums explaining that the intention should be to get rid of laitance to the requirement of the grout supplier surface roughness in order to achieve the grouts properties as stated.
However i see in ACI 351.1 Cl 6.2.3 that this 25mm for epoxy grout and 6mm for cementitious grout is not only for laitance but to manage the thermal expansion of the epoxy grout.
Does anyone have evidence this is required? typically here in Australia we scabble and grout without thinking too hard.