SaRaKr
Mechanical
- Mar 7, 2009
- 3
Hi members
Refernce: API 6A type 6BX 10K PSI flange
Flange SIZE RANGE: 4-1/16, 11, 13-5/8.
Pipe size: NPS 4, 14, 16 respectively ASME B36.10
Background;
API 6A 2010 does not recommend transition pieces to match flange 'small diameter of hub J2' with ASME B36.10 PIPES. However the total length of flange is also no finalized in API 6A.
Query
1. Why does code does not finalize total height of flange.
2. What is the significance of indicating minimum 6mm after length of hub J3. i.e who will finalize the length and based on what parameters.
3. Why was the requirement of transition pieces removed from API 6A to match pipe OD.
4. Can a API 6A type 6BX 10k PSI flange ends be tapered to match ASME B 36.10 pipes as per API RP 14E APPENDIX B without using transition piece. (Can API 6A-monogram be used for the flange after tapering?)
Please share ur opnion/experince.
Thanks in advance
Refernce: API 6A type 6BX 10K PSI flange
Flange SIZE RANGE: 4-1/16, 11, 13-5/8.
Pipe size: NPS 4, 14, 16 respectively ASME B36.10
Background;
API 6A 2010 does not recommend transition pieces to match flange 'small diameter of hub J2' with ASME B36.10 PIPES. However the total length of flange is also no finalized in API 6A.
Query
1. Why does code does not finalize total height of flange.
2. What is the significance of indicating minimum 6mm after length of hub J3. i.e who will finalize the length and based on what parameters.
3. Why was the requirement of transition pieces removed from API 6A to match pipe OD.
4. Can a API 6A type 6BX 10k PSI flange ends be tapered to match ASME B 36.10 pipes as per API RP 14E APPENDIX B without using transition piece. (Can API 6A-monogram be used for the flange after tapering?)
Please share ur opnion/experince.
Thanks in advance