TugboatEng
Marine/Ocean
- Nov 1, 2015
- 11,774
I'm going to ask this very generally but has anybody experienced rules from their grid operators with regards to large loads? For instance I may need to apply a 5-10 MW load to the grid multiple times per day. Is the grid going to tolerate this or will I need to schedule the loading? This is an inverter load so it won't see inrush like a motor load.