Hello,

I'm looking for an end of bridge detail in which a precast approach slab is supported on GRS and post-tensioned to precast full depth deck panels, which are supported on steel or concrete beams. Apparently this detail was used on the Tennessee Fast Fix 8 bridges for I-40 over Clinton St. and CSX RR.

Does anyone know of this detail and could provide more information, or perhaps a link to these drawings? I've searched the TDOT website for the drawings and haven't been able to find them.

Thanks for any help.
 