Dumbo2929
Electrical
- May 31, 2005
- 109
I was wondering what people are doing as part of arc flash evaluations when you have both 3-phase and single-phase equipment (panels, etc.) My experience is that some arc flash software ignores single phase equipment and that it is somewhat ignored in NFPA-70E. It seems silly to have a HRC/PPE specific label on a 3-phase panel and have a single-phase panel right next to it with no label. Any thoughts?